Skip to main content

EOL: End of software maintenance and provisioning

On this page, you find an overview of the areas and functions within plentymarkets whose software maintenance and provisioning will be ended. This overview does not replace the Changelog thread or the thread sticked to the corresponding category in the plentymarkets Forum. Rather, this page provides a central overview to ensure that this information does not get lost due to the large amount of threads in the plentymarkets forum.

Table 1. EOL overview
Area/Function End of software maintenance End of provisioning [1] Further informationen Announcement date

plentymarkets version 6

01-Sep-2016 (extended until 01-Feb-2017)

01-Sep-2018

Forum link

01-Sep-2016

plentymarkets Client

04-Feb-2017

05-Feb-2018[2]

Forum link

04-Feb-2017

Mobile Warehouse

01-Feb-2018

23-Apr-2018

Announcement link 1 and Announcement link 2

01-Feb-2018

SOAP API versions

23-Apr-2018 and 22-May-2018

23-Apr-2018 (plentymarkets Version 6: 105, 109, 110, 111 plentymarkets 7: 105, 109, 110, 111, 112, 113, 114)
22-May-2018 (plentymarkets 6: 112, 113, 114)

Forum link

09-Apr-2018

Classic back end

15-Jun-2018

11-Jul-2018

Forum link

04-Jun-2018

Checkout of the old online store (Callisto checkout)

01-Sep-2018

01-Sep-2019

Forum link

07-Mar-2018

Callisto (old online store)

01-Sep-2018

Q1 2020

Forum link

07-Mar-2018

TLS 1.0 protocol

30-Sep-2018

30-Sep-2018

Forum link

11-Jul-2018

plentyConnect

After migrating to plentymarkets 7

plentyShipping

After migrating to plentymarkets 7


1. Date from which the function is no longer available
2. Since this date, installation files can no longer be downloaded.
To top